The LINX Mission Critical team delivers state-of-the-art data center cabling infrastructure solutions for hyperscale, colocation, and large enterprise data center customers.

The project involved several key installations and buildouts. Firstly, a 3456-strand OSP fiber metro connection was installed, spanning over a mile in length, to connect the existing campus to a new building. In addition, there was a buildout of four data halls data center, which included the installation of copper cables and various fiber cables, […]

Read More

LINX successfully handled five project sites simultaneously across the United States, with a comprehensive Scope of Work (SOW). The SOW included the following tasks: receiving materials, installing cabling and cable management components, connecting copper cabling between cabinets and out-of-band (OoB) cabinets, linking spine ports to the distribution panel based on port assignments, connecting fabric ports, […]

Read More

LINX, has successfully completed the installation of low voltage infrastructure and cabling for a cloud based customer across several locations. This involved installing and testing both fiber and copper infrastructure for their production and non-production systems. In addition, LINX has implemented fabric switch racks to streamline access and facilitate future technology updates. The company’s emphasis […]

Read More

LINX successfully executed various low-voltage Statements of Work (SOWs) encompassing telecom, security, and audiovisual (A/V) aspects. The telecom SOW involved setting up two Main Equipment Rooms (MMR), installing 3200 feet of basket tray, placing 39 cabinets, connecting 648 strands of fiber, establishing 13 Intermediate Distribution Frame (IDF) locations, and establishing fiber connections between buildings. The […]

Read More

The project involved the construction of three data halls, encompassing various aspects such as data infrastructure, security measures (including access control and video surveillance), BMS (Building Management System) cabling, installation of cable trays spanning 1200 feet, deployment of 30 wireless access points (WAPs), building hot aisle containment structures and partition walls (4 in total), and […]

Read More

Four HAC units were installed in an exposed ceiling, and they were connected to the fan wall for proper functioning. In addition, a partition wall was installed specifically for the HAC system. The ceiling was supported using a collar design to ensure stability and structural integrity. In terms of project management, close coordination was maintained […]

Read More