|

The building is fully-wired and ready. And, the service provider has connected to the handoff point. But the handoff point is 150 meters from the MPOP in the building. 150 meters separate the tenants from the high-speed internet essential for the work place. Surprise! The building owner is responsible for the circuit extension (“backbone pathway”) […]

Read More

,

|

The “three-legged stool” is a term used by people who work in the low-voltage industry. The distributor, manufacturer and contractor work together to create a stable platform to support a deal; hence the “three-legged stool” reference. This strategy was created to enhance their chances of winning a project. Customers (i.e., general contractors, electrical contractors and […]

Read More