Four HAC units were installed in an exposed ceiling, and they were connected to the fan wall for proper functioning. In addition, a partition wall was installed specifically for the HAC system. The ceiling was supported using a collar design to ensure stability and structural integrity. In terms of project management, close coordination was maintained with engineering, electrical, and fire contractors to ensure smooth integration of the HAC units. The project schedule was highly compressed, requiring the last contractor to be on-site and the first contractor to complete their tasks in order to meet the tight deadline.